New replaces old, take a look behind the scenes

25 metres finished, on to stage 2: the next 25 metres of innovation. To do this, we have removed the old welding robots and reinforced the floor with ferroconcrete that can withstand the weight of the new installation. Are you wondering how this looks in 60 seconds? Check out the time lapse!

oude-lasrobot-altrex