Altrex International
We have reached a milestone with the construction of our new welding line. The last welding robot has been installed and now the construction of the 75-meter-long welding line is ready. Obviously a fantastic highlight. Yet there are still many things to do!
In the next few weeks, all welding robots will be adjust and we are still busy testing the software so all robots can co-operate at all 15 stations. However, we are almost there. Curious about the installation and assembly of the last robot? Take a look at the pictures below.