Scaffolds Application 1 May 2023

How do you build an RS TOWER 5-S rolling tower with Safe-Quick®?

The RS TOWER 52 is the rolling tower that you can build, either indoors or outdoors. The system can be expanded with components from the RS TOWER 5-series. You can also connect the rolling tower to other elements, such as staging or an extension console. But how do you actually build this rolling tower with Safe-Quick®? We show you.

If you are planning to work at an uneven working height, then start with a 7-rung frame. Are you going to work at an even height? Then start with a 4-rung frame. Next, place four wheels in the frames.

afbeelding-1

Put the frames on their wheels. Place horizontal braces under the first rung on the upright. Placing a horizontal brace is very important for the stability of the rolling tower. Therefore, make sure that you secure the horizontal braces from the inside to the outside. This creates the most stability. Then turn the wheels out and lock the brakes.

afbeelding-3

Place the Safe-Quick GuardRails® on the top rung. Make sure that the instruction label is facing inwards. This allows you to read the instructions during construction and dismantling. Then fit a temporary platform. When fitting the platform it is important that you fit the red hooks first. A sticker on the arms of the Safe-Quick® shows which rung you need to fit the platform on. Ensure the basic selection is level.

afbeelding-5

Mount the triangular stabilisers. Secure the upright under the 7th rung and the beam between the 1st and 2nd rung. Adjust it so that the ends touch the ground.

afbeelding-7

Get on to the (temporary) platform and fit a 7-rung frame.

afbeelding-9

Secure the frame with the locking pin. This is important for the safety of the tower.

afbeelding-11

Place the Safe-Quick Guardrails® on the top rung with the instruction label facing inwards. Fit a platform with a trap door. When fitting the platform it is important that you fit the red hooks first. Get on to the platform through the trap door. Repeat these steps until the desired platform/working height is reached.

afbeelding-13

Note: to finish, place the toe board holders and toe boards on the highest platform. This prevents your tools from falling off the platform. The rolling tower is now ready for use.

afbeelding-15
nieuwsbrief-inschrijven-9

Would you like to receive more hints and tips?

Subscribe now to the Altrex newsletter to stay up to date on the latest developments and innovations, and you'll be first to receive the latest news.